You are here

Modernisation

The challenge

As the hydropower sector prepares for the future, a growing number of facilities are due for modernisation.

By 2030 over half of the world’s existing hydropower plants will have undergone, or will be due to undergo, upgrading and modernisation, according to IHA’s hydropower database. 

By 2050, all current hydropower facilities are predicted to require modernisation. 

Read more

To ensure that existing assets are retained and available to meet the future role of hydropower in energy systems, traditional modernisation practices will need to consider more than just ‘business as usual’ replacements. 

Major refurbishment projects will look at both improved performance and innovative technologies. For example, fast response capability and optimised operating modes can ensure that hydropower assets have the flexibility to support higher penetrations of variable renewables.

A successful modernisation programme will bring the best technologies from the next generation of hydropower projects to an existing facility.

 

Our strategy and action

IHA is supporting the exchange of industry experiences and innovation in modernisation programmes. 

We are working closely with our members to explore the range of investment strategies for improving and extending the lives of existing hydropower assets.

 

Read more

Our modernisation work programme is gaining insights into how organisations are improving equipment design to provide greater functionality and flexibility within the changing energy system, enhance grid support, reduce operating costs and build resilience to climate change.

IHA members will benefit from briefings and webinars on accepted good practice from leading organisations in the hydropower sector.

 

Join the network

Asset management.png

Members can exchange experiences and learn from industry experts on successful modernisation programmes by joining IHA’s Asset Management Knowledge Network

Hydropower Pro

IHA members can access the knowledge network in Hydropower Pro, our online member community.

In the online group, network members can connect with each other, exchange experiences and access essential resources, briefings and case studies.

For any questions, please contact IHA analyst David Samuel at david.samuel@hydropower.org 

Latest associated content

  • Renewing collaboration in China

    The China Institute of Water Resources and Hydropower Research (IWHR) and IHA extended their collaboration by renewing their co-operation agreement last week, 26 February.

    Type:
    News post
    Date:
    4 March 2014
  • Jean-Michel Devernay

    Interview: Jean-Michel Devernay, World Bank

    Jean-Michel Devernay is the World Bank's chief technical specialist for hydropower.

    Type:
    Blog post
    Date:
    28 February 2014
  • Members meeting in Brazil

    Some 20 senior representatives of our corporate members met in Brazil last week.

    Type:
    News post
    Date:
    4 February 2014
  • Gil Maranhão Neto

    Interview: Gil Maranhão Neto, GDF Suez

    Gil Maranhão Neto is the director of business development at GDF Suez Energy Brasil. He spoke with us about the hydropower environment in the Amazon region, the role of the private sector and the impacts of IHA's work.

    Type:
    Blog post
    Date:
    4 February 2014
  • Understanding energy in Brazil

    Understanding energy in Brazil

    With Alexandre Uhlig, Instituto Acende, Brazil

    Type:
    Blog post
    Date:
    3 February 2014

Pages

Subscribe to RSS - Modernisation