You are here

Modernisation

The challenge

As the hydropower sector prepares for the future, a growing number of assets are due for modernisation.

By 2030 over half of the world’s existing hydropower facilities will have undergone, or will be due to undergo, upgrading and modernisation, according to IHA’s hydropower database. 

By 2050, all current hydropower facilities are predicted to require modernisation. 

Read more

To ensure that existing assets are retained and available to meet the future role of hydropower in energy systems, traditional modernisation practices will need to consider more than just ‘business as usual’ replacements. 

Major refurbishment projects will look at both improved performance and innovative technologies. For example, fast response capability and optimised operating modes can ensure that hydropower assets have the flexibility to support higher penetrations of variable renewables.

A successful modernisation programme will bring the best technologies from the next generation of hydropower projects to an existing facility.

 

Our strategy and action

IHA is supporting the exchange of industry experiences and innovation in modernisation programmes. 

We are working closely with our members to explore the range of investment strategies for improving and extending the lives of existing hydropower assets.

Throughout 2019, we will compile a compendium of case studies illustrating well-established and cutting-edge methodologies to showcase some of the best examples of modernisation. We will consult with our members to share knowledge on decision-making processes, including challenging life extension decisions and innovative enhancements.

Read more

Our modernisation work programme will gain insights into how organisations are improving equipment design to provide greater functionality and flexibility within the changing energy system, enhance grid support, reduce operating costs and build resilience to climate change.

IHA members will benefit from briefings and webinars on accepted good practice from leading organisations in the hydropower sector.

 

Recent activities

To learn more about our recent activities, read our Activity and Strategy Report for 2018-2019.


Asset management.png

 

Join the network

Members can exchange experiences and learn from industry experts on successful modernisation programmes by joining IHA’s Asset Management Knowledge Network

Hydropower Pro

IHA members can access the knowledge network in Hydropower Pro, our online member community.

In the online group, network members can connect with each other, exchange experiences and access essential resources, briefings and case studies.

For any questions, please contact IHA analyst David Samuel at david.samuel@hydropower.org 

Latest associated content

  • Maria Van Der Hoeven

    Interview: Maria Van Der Hoeven, Executive Director, IEA

    Maria Van Der Hoeven is the executive director of the International Energy Agency.

    Type:
    Blog post
    Date:
    16 October 2014
  • Cameron Ironside

    Building effective regulatory frameworks for hydropower

    On Thursday 4 September at World Water Week 2014 in Stockholm, we collaborated with the International Institute for Environment and Development (IIED) and the International Union for Conservation of Nature (IUCN) to convene a se

    Type:
    Blog post
    Date:
    12 September 2014
  • Richard Taylor speaking at World Water Week

    The future energy mix: water as energy storage

    On Thursday 4 September at World Water Week 2014 in Stockholm, we joined with the Centre for Environmental Design of Renewable Energy (CEDREN) and the United Nations Institute for Integrated Management of Material Fluxes and Res

    Type:
    Blog post
    Date:
    11 September 2014
  • Norberto Odebrecht

    Faces of hydropower: Norberto Odebrecht

    A conglomerate operating in 23 countries through its 15 businesses, three investment funds and five supporting companies, Odebrecht Organisation employs nearly 200,000 people today and is one of the important actors in the hydro

    Type:
    Blog post
    Date:
    27 August 2014
  • Piyush Goyal

    Six signs that India’s hydropower sector is moving forward

    On 5–6 August, hydropower stakeholders congregated at the National Conference on Hydropower in India, organised by the Federation of Indian Chambers of Commerce and Industry (FICCI).

    Type:
    Blog post
    Date:
    26 August 2014

Pages

Subscribe to RSS - Modernisation