You are here

Modernisation

The challenge

As the next generation of hydropower projects are being planned, facilities built in past decades are due for modernisation.

By 2030 over half of the world’s existing hydropower facilities will have undergone or will be due to undergo upgrading and modernisation, according to IHA’s hydropower database.

By 2050, all current hydropower facilities are predicted to require modernisation.

Read more

Modernisation goes beyond the business-as-usual replacement and refurbishment of equipment and optimisations to plant operations and maintenance (O&M).

A successful modernisation programme will bring the best technologies from the next generation of hydropower projects to an existing facility to extend its life and power output.

 

Our strategy and action

IHA is supporting the exchange of industry experiences and innovation in modernisation programmes.

We are working closely with IHA members to explore the range of strategies for plant life extension and the adoption of new technologies with a focus on existing facilities.

Throughout 2018, we will develop decision-making guidance for asset management, and build a compendium of case studies illustrating well-established and cutting-edge modernisation methodologies.

Read more

Our modernisation work programme will gain insights into how organisations are improving equipment design to provide greater functionality and flexibility within the changing energy system, enhance grid support, and build resilience to climate change.

Members will benefit from briefings and webinars on accepted good practice from leading organisations in the hydropower sector.

 

Recent activities

Read more

In September 2017, IHA’s new Board approved the new Modernisation knowledge programme at its inaugural meeting.

In November 2017, we began to identify industry-leading modernisation approaches and experts in the field.

In December 2017, we identified case studies in different regions of the world with the assistance of Mott MacDonald. A roadmap detailing the steps to the deliverables was prepared.


 

Join the network

Members can exchange experiences and learn from industry experts on successful modernisation programmes by joining IHA’s Asset Management Knowledge Network

Hydropower Pro

IHA members can access the knowledge network in Hydropower Pro, our online member community.

In the online group, network members can connect with each other, exchange experiences and access essential resources, briefings and case studies.

For any questions, please contact IHA analyst David Samuel at david.samuel@hydropower.org 

Latest associated content

  • Aquatic species research in Canada

    When monitoring and mitigation reduce impacts on fish

    An independent scientific study has shown that the impact of run-of-river hydroelectric projects on salmon has been minimal based on the monitoring data provided to date.

    Type:
    Blog post
    Date:
    30 June 2014
  • Etalin project location

    New approaches to hydropower development in India

    Jindal Power Limited, India’s leading power generation company with a portfolio of 15,000 MW in various stages of operation, implementation, development and planning in hydro and thermal, has signed a partnership with the Intern

    Type:
    Blog post
    Date:
    4 June 2014
  • Eastmain-1-A-Sarcelle-Rupert project

    Case study: partnerships with local communities

    In 2013, Canadian utility Hydro-Québec completed the construction of the Eastmain-1-A-Sarcelle-Rupert hydroelectric development at James Bay, encompassing an area of 46,164 sq km, for a planned electricity output of 8.7 TWh.

    Type:
    Blog post
    Date:
    30 May 2014
  • Jacob Irving

    Interview: Jacob Irving, Canadian Hydropower Association

    Jacob Irving is the president of the Canadian Hydropower Association. In this interview he speaks about the hydropower sector in Canada, plans to develop new installed capacity, and cross-border trading with the USA.

    Type:
    Blog post
    Date:
    23 May 2014
  • Elsbeth Tronstad

    Interview: Elsbeth Tronstad, SN Power

    Elsbeth Tronstad is executive vice president of SN Power for corporate social responsibility, environment, communications and human resources. She speaks about the business case for sustainability in hydroelectric projects, and the importance for companies to get it right.

    Type:
    Blog post
    Date:
    5 May 2014

Pages

Subscribe to RSS - Modernisation