You are here

Modernisation

The challenge

As the hydropower sector prepares for the future, a growing number of assets are due for modernisation.

By 2030 over half of the world’s existing hydropower facilities will have undergone, or will be due to undergo, upgrading and modernisation, according to IHA’s hydropower database. 

By 2050, all current hydropower facilities are predicted to require modernisation. 

Read more

To ensure that existing assets are retained and available to meet the future role of hydropower in energy systems, traditional modernisation practices will need to consider more than just ‘business as usual’ replacements. 

Major refurbishment projects will look at both improved performance and innovative technologies. For example, fast response capability and optimised operating modes can ensure that hydropower assets have the flexibility to support higher penetrations of variable renewables.

A successful modernisation programme will bring the best technologies from the next generation of hydropower projects to an existing facility.

 

Our strategy and action

IHA is supporting the exchange of industry experiences and innovation in modernisation programmes. 

We are working closely with our members to explore the range of investment strategies for improving and extending the lives of existing hydropower assets.

Throughout 2019, we will compile a compendium of case studies illustrating well-established and cutting-edge methodologies to showcase some of the best examples of modernisation. We will consult with our members to share knowledge on decision-making processes, including challenging life extension decisions and innovative enhancements.

Read more

Our modernisation work programme will gain insights into how organisations are improving equipment design to provide greater functionality and flexibility within the changing energy system, enhance grid support, reduce operating costs and build resilience to climate change.

IHA members will benefit from briefings and webinars on accepted good practice from leading organisations in the hydropower sector.

 

Recent activities

To learn more about our recent activities, read our Activity and Strategy Report for 2018-2019.


Asset management.png

 

Join the network

Members can exchange experiences and learn from industry experts on successful modernisation programmes by joining IHA’s Asset Management Knowledge Network

Hydropower Pro

IHA members can access the knowledge network in Hydropower Pro, our online member community.

In the online group, network members can connect with each other, exchange experiences and access essential resources, briefings and case studies.

For any questions, please contact IHA analyst David Samuel at david.samuel@hydropower.org 

Latest associated content

  • IHA members present at CHINCOLD annual meeting

    The 2013 Annual Meeting of CHINCOLD and the 3rd International Symposium on Rockfill Dams took place last week in Kunming, China. 

    Type:
    News post
    Date:
    4 November 2013
  • New IHA president and vice presidents elected

    The newly-elected IHA Board gathered in London last week for its first meeting.

    Type:
    News post
    Date:
    29 October 2013
  • New horizons

    New horizons

    Even when countries have a wealth of untapped hydropower potential available, why can it still remain a challenge to entice financial investors to become involved?

    Type:
    Blog post
    Date:
    7 October 2013
  • Download the latest issue of Currents magazine

    Download the latest issue of Currents magazine

    The October 2013 issue of Currents magazine brings together voices from across the hydropower sector. 

    Type:
    News post
    Date:
    1 October 2013
  • The power of belief

    The power of belief: breathing life into communities

    Difficulties in recruiting a skilled workforce locally has led to the creation of an inspiring and empowering professional education programme.

    Type:
    Blog post
    Date:
    1 October 2013

Pages

Subscribe to RSS - Modernisation