Modernisation

The challenge

As the next generation of hydropower projects are being planned, facilities built in past decades are due for modernisation.

Modernisation goes beyond the business-as-usual replacement and refurbishment of equipment and making optimisations to plant operations and maintenance (O&M).

A successful modernisation programme will bring the best technologies from the next generation of hydropower projects to an existing facility to extend its life and power output.

Read more

By 2030 over half of the world’s existing hydropower facilities will have undergone or will be due to undergo upgrading and modernisation, according to IHA’s hydropower database.

By 2050, all current hydropower facilities are predicted to require modernisation. 

 

Our strategy and action

IHA is supporting the exchange of industry experiences and innovation in modernisation programmes.

We are working closely with IHA members to explore the range of strategies for plant life extension and the adoption of new technologies with a focus on existing facilities.

Throughout 2018, we will develop decision-making guidance for asset management, and build a compendium of case studies illustrating well-established and cutting-edge modernisation methodologies.

Read more

Our modernisation work programme will gain insights into how organisations are improving equipment design to provide greater functionality and flexibility within the changing energy system, enhance grid support, and build resilience to climate change.

Members will benefit from briefings and webinars on accepted good practice from leading organisations in the hydropower sector. 

 

Recent activities

Read more

In September 2017, IHA’s new Board approved the new Modernisation knowledge programme at its inaugural meeting.

In November 2017, we began to identify industry-leading modernisation approaches and experts in the field.

In December 2017, we identified case studies in different regions of the world with the assistance of Mott MacDonald. A roadmap detailing the steps to the deliverables was prepared. 

 

Latest associated content

  • International training workshop on hydropower concludes in China

    The fifth International Training Workshop on Planning, Construction and Operation Management of Small and Medium Hydropower Stations was recently held in Changsha, the capital of central China’s Hunan province.

    Type:
    News post
    Date:
    6 November 2015
  • Workers wearing safety equipment ascending a staircase in a hydropower station

    Seven ways to make a hydropower station a safer workplace

    Hydropower stations can pose significant safety risks to those who work in them, but there is no excuse for injury or death in our workplaces.

    Type:
    Blog post
    Date:
    30 September 2015
  • Photograph of Hidroelectrica staff and contractors in the Surduc-Nehoiaşu headrace tunnel on the day of it

    Hidroelectrica completes the Surduc-Nehoiasu hydropower tunnel

    Hidroelectrica, the Romanian state-owned hydropower company, held an inauguration ceremony on 10 September following the completion of the country’s longest headrace tunnel built since 1984, representing an investment of m

    Type:
    News post
    Date:
    29 September 2015
  • 2015 Hydropower Status Report

    2015 Hydropwer Status Report available for download

    The 2015 Hydropower Status Report is now available for download, providing comprehensive insights into new global developments in the sector, statistics on new installed capacity, detailed regional analysis, and more.

    Type:
    News post
    Date:
    1 September 2015
  • IHA Board candidates

    IHA Board elected for 2015–17

    We are pleased to announce the results of the election of the IHA Board to serve for the period to October 2017.

    Type:
    News post
    Date:
    31 July 2015