You are here

Asset management

Forward-looking operations and maintenance strategies for hydropower facilities are required to ensure the best outcomes under time and financial constraints.

IHA focuses on supporting its members with information on the modernisation of existing hydropower infrastructure, including strategies to extend the life of a plant and optimise operations.

A key focus is placed on innovative strategies beyond just business-as-usual. This may include anything from major upgrades to enhance hydropower functionality in a changing energy system, to measures to improve environmental resilience and sustainable operations in the face of future uncertainties.

Modernisation

By 2030 over half of the world’s existing hydropower facilities will have undergone or will be due to undergo upgrading and modernisation, according to IHA’s hydropower database.

We are working closely with IHA members to explore the range of strategies for plant life extension and the adoption of new technologies with a focus on existing facilities. Read more

Operations and maintenance

Poor operations and maintenance, through a lack of investment, inadequate training or outdated approaches, can cause high outage rates, performance losses and increased operating costs. This can lead to lost energy production, reduced revenues and in some cases result in dam safety and environmental concerns.

We are supporting members to better understand and exchange information on good practices in O&M for both existing and future hydropower plants. Read more

Latest associated content

  • Aquatic species research in Canada

    When monitoring and mitigation reduce impacts on fish

    An independent scientific study has shown that the impact of run-of-river hydroelectric projects on salmon has been minimal based on the monitoring data provided to date.

    Type:
    Blog post
    Date:
    30 June 2014
  • Etalin project location

    New approaches to hydropower development in India

    Jindal Power Limited, India’s leading power generation company with a portfolio of 15,000 MW in various stages of operation, implementation, development and planning in hydro and thermal, has signed a partnership with the Intern

    Type:
    Blog post
    Date:
    4 June 2014
  • Eastmain-1-A-Sarcelle-Rupert project

    Case study: partnerships with local communities

    In 2013, Canadian utility Hydro-Québec completed the construction of the Eastmain-1-A-Sarcelle-Rupert hydroelectric development at James Bay, encompassing an area of 46,164 sq km, for a planned electricity output of 8.7 TWh.

    Type:
    Blog post
    Date:
    30 May 2014
  • Jacob Irving

    Interview: Jacob Irving, Canadian Hydropower Association

    Jacob Irving is the president of the Canadian Hydropower Association. In this interview he speaks about the hydropower sector in Canada, plans to develop new installed capacity, and cross-border trading with the USA.

    Type:
    Blog post
    Date:
    23 May 2014
  • Elsbeth Tronstad

    Interview: Elsbeth Tronstad, SN Power

    Elsbeth Tronstad is executive vice president of SN Power for corporate social responsibility, environment, communications and human resources. She speaks about the business case for sustainability in hydroelectric projects, and the importance for companies to get it right.

    Type:
    Blog post
    Date:
    5 May 2014

Pages

Subscribe to RSS - Asset management