You are here

Sediment management

The challenge

Over the lifetime of a hydropower dam, sediment will be trapped behind the infrastructure and deposited in the reservoir.

Dams are traditionally designed to provide enough reservoir storage to offset at least 50 to 100 years of sedimentation, which is caused by natural erosion and activities such as construction, deforestation and agriculture.

Read more

As the reservoir accumulates sediment, its storage capacity will decrease. Sedimentation also causes operational and maintenance challenges, resulting in the obstruction of water intake, the abrasion of mechanical equipment, and reductions in power supply.

Downstream environmental impacts can include increased erosion, reduction in nutrient deposits inland and retreat of deltas. Changes in sedimentation due to climate change can also compromise the performance of a facility.

Effective sediment management is essential for ensuring storage capacity for water and renewable energy supply, and for protecting the health of the ecosystems that a river system supports.

 

Our strategy and action

IHA is building awareness and disseminating knowledge on successful sediment management strategies.

Working in close collaboration with a group of industry experts and partner organisations, we are identifying and sharing good practices on managing sediment in a variety of geographies and environments.

In December 2016, we partnered with the World Bank on a project to study and document strategies and case studies across the world. These resources are now available on a new Hydropower Sediment Management Knowledge Hub.

Read more

In our engagement with IHA members, emphasis is always given to the adoption of sustainable practices: both at the initial stages of hydropower development and throughout the operation of a project.

Throughout 2018, we will continue to provide a platform for the sharing of strategies and resources to minimise the impacts of sedimentation and extend the life of hydropower facilities and reservoirs.

 

Recent activities

Read more

In January 2017, we began work on a project funded by the South Asia Water Initiative - a partnership between the World Bank and the governments of UK, Australia and Norway - to document sediment management strategies and case studies around the world.

In May 2017, at the World Hydropower Congress, we convened a workshop of members and stakeholders to discuss success stories and lessons learned in sediment management. In two other events, initiatives to reduce upstream erosion were introduced. They included cloud-forest conservation mechanisms and watershed management in the Ethiopian highlands.

In September 2017, a beta version of the Hydropower Sediment Management Knowledge Hub was made accessible online and later, in November, was showcased at a hydropower sector conference in Medellin, Colombia.

In December 2017, the Hydropower Sediment Management Knowledge Hub was launched with 18 case studies from 15 countries in Africa, Asia, Europe, Central and South America and the Pacific. Downloadable resources include the RESCON2 tool to help developers and operators choose an appropriate sediment management strategy.


 

Join the network

IHA’s Sediment Management Knowledge Network supports members to learn and exchange experiences on sediment management.

If you are an IHA member, you can join the Sediment Management Knowledge Network

Contact us

For any questions, please contact IHA senior analyst María Ubierna at maria.ubierna@hydropower.org

Latest associated content

  • IHA Board candidates

    IHA Board elected for 2015–17

    We are pleased to announce the results of the election of the IHA Board to serve for the period to October 2017.

    Type:
    News post
    Date:
    31 July 2015
  • World Hydropower Congress

    Video: 2015 World Hydropower Congress

    The 2015 World Hydropower Congress took place on 19–21 May in Beijing, China, bringing together over 1,000 representatives of government, the finance sector, civil society, academia and industry to discuss a sustainable pathway

    Type:
    Blog post
    Date:
    12 June 2015
  • Richard Taylor congress closing

    2015 World Hydropower Congress: days two and three in pictures

    The 2015 World Hydropower Congress has drawn to a close. Here we take a look at the highlights of the final two days of the congress.

    Type:
    Blog post
    Date:
    20 May 2015
  • Ken Adams opening ceremony speech

    2015 World Hydropower Congress: day one in pictures

    The 2015 World Hydropower got under way at the iconic Sunrise Kempinski Hotel at Yanqi Lake, Beijing, China on Tuesday 19 May. Here are some of the best moments from the opening day.

    Type:
    Blog post
    Date:
    19 May 2015
  • World map

    36 GW of hydropower added in 2014

    A new IHA briefing, 2015 Key Trends in Hydropower, shows that hydropower is continuing its strong growth trend with 36 GW of new capacity added in 2014.

    Type:
    Blog post
    Date:
    19 May 2015

Pages

Subscribe to RSS - Sediment management